Commissioning
It is recommended that commissioning of the installed assemblies is carried
out by TCS's own engineers wherever possible. Our highly skilled personnel are
familiar with all aspects of the TCS product range from small conventional wall
mounted control panels to major intelligent motor control centres.
Working to pre-prepared commissioning plans and method statements, TCS can
provide the correct personnel to commission every aspect of any assembly and the
connected plant and equipment, providing the client with the finished
operational plant working to his requirements.
Full documentation is provided at each stage of commissioning recording all
settings calibrations and test result. This information then forms part of the
final operation and maintenance manuals provided for each contract.
|
Testing
All testing carried out on assemblies are carried out to approved quality
plans and address every requirement of BS EN 60439-1. A full certification pack is assembled and incorporated in the Operations and
Maintenance Manual, this comprising:
- Temperature rise checked and confirmed by application of BS EN 60890 or
Optima as appropriate, validation documents and declaration of conformity.
- Dielectric type-test certificate for busbars issued if appropriate.
- Short-circuit withstand type-test certificate issued for busbars if
appropriate.
- Test certificate for every single earthing conductor confirming its
effectiveness.
- Short-circuit withstand type-test certificate issued for main earth bar if
appropriate.
- Type-test certificate for clearance and creepage on busbars, Specific test
documents and declaration of conformity.
- Validation documents and declaration of conformity for mechanical operations
where appropriate.
- Validation documents and declaration of conformity for enclosure degree of
protection.
- Functional test results.
- Insulation test results.
- Protective measures inspection results.
- EU Declaration of Conformity, confirming conformity with the LV Directive
and EMC Directive.
|
|